Skip to content

docs(intelligence): bind merged-source convergence - #95

Merged
eamirian merged 2 commits into
mainfrom
codex/measured-intelligence-merged-source-convergence
Aug 11, 2026
Merged

docs(intelligence): bind merged-source convergence#95
eamirian merged 2 commits into
mainfrom
codex/measured-intelligence-merged-source-convergence

Conversation

@eamirian

@eamirian eamirian commented Aug 11, 2026

Copy link
Copy Markdown
Contributor

Problem and scope

Advances #38 with the bounded post-merge convergence receipt. This documentation-only packet binds exact Core main commit 7013de62ae7320c51c3de9e9a03b049e768e4d84, World PR #17, and the independent Market production-store reproduction.

Owned files are one work packet, one immutable candidate evidence record, the evidence index, and restrained current-state roadmap/maturity reconciliation. Runtime code, schemas, package versions, workflows, tags, releases, proposal application, and issue checklists are excluded.

Product boundary and compatibility

Core continues to own durable state, identity, provenance, authority, Decision, Action, Outcome, append-only replay, and proposal coordinates. Intelligence owns only the neutral matched evaluator. World and Market retain their own nouns, sources, criteria, controls, and outcome meaning.

The World result remains bounded useful with a non-effective promote proposal. The materially different Market result remains unproven with a non-effective reject proposal. Neither proposal is selectable or applied.

This remains an experimental 0.6 candidate. It does not pass SI4, establish causality or general benefit, change the eleven-tool MCP surface, close #38, or claim ACE 0.6.0 complete.

Evidence

  • Core, reference Action adapter, World source adapter, and World wheels each built twice with byte-identical pairs.
  • Exact Core wheel: sha256:662c4197f3ff0cf7dc1e64b0f8bc6bc705c8a1d6373a8468d9cb1d2df3d8c214.
  • Fresh installed-artifact World runs: canonical sha256:c62a7db77b66a15f2930c850bdb8bbc44b542f928c2e0b146b5bf3dde08f30df twice.
  • World: 123 complete-suite tests, 80 connector tests, 7 release-contract tests, 10 updated convergence controls; PR CI run 31522715774 passed.
  • Market: 379 passed, 8 skipped, 4 deselected; focused production-store authority/atomicity/replay 5 passed; fresh-process reopen survived a real SurrealDB restart.
  • Core merged measured-impact/F1/F5 focus: 82 passed; main CI run 31520372788 passed all six gates.
  • Evidence-index and kernel boundary: 9 passed.
  • Clean installed-environment vulnerability audit: no known vulnerabilities; the two separately built unpublished adapters were explicitly skipped as unavailable on PyPI.
  • git diff --check: passed.

No credential, private fixture, private source, customer material, or private extension code is included.

Risk and rollback

The main risk is mistaking candidate artifact convergence for release or benefit evidence. The packet keeps release state at Next, records public-index-only installation as impossible before publication, and preserves all causal, population, live-freshness, SI4, and human-benefit non-claims.

Rollback removes only the additive packet/evidence and their current-state references. No runtime or durable history changes.

Issue #49 remains open. On 2026-08-11, the authenticated release owner marked F1/F5 complete against merged Core and re-dated unresolved, unwaived F3 to 2026-11-05 under the containment recorded on the issue.

Checklist

  • I used no private data, credentials, proprietary fixtures, or private-extension code.
  • I updated documentation for actual demonstrated state and did not overstate maturity.
  • I ran focused checks, relevant conformance checks, artifact/security verification, and git diff --check.
  • I linked the public milestone and recorded the explicit issue Track accepted E1 post-release security hardening (F1–F7) #49 disposition without treating F3 as resolved.
  • No security-sensitive detail beyond the existing public issue wording is disclosed.

@eamirian

Copy link
Copy Markdown
Contributor Author

Final-head verification: CI run 31523302245 passed all six gates on commit cb845dd (lint, fast tests, naked kernel, Canvas, security audit, and Docker build). World PR #17 is also green at evidence head a85da4289ff80fff6e6507b546dca191ff92d841 via run 31522715774. Issue #49 checklist reconciliation remains an explicit owner action; this draft does not infer that disposition.

@eamirian

Copy link
Copy Markdown
Contributor Author

Authenticated release-owner authorization — 2026-08-11:

The release owner authorizes this documentation-only convergence packet to leave draft and squash
merge at exact head 475cdf537e1ebae941785adb539bb2b48489c739. All six required Core checks pass. The bounded
World useful and independent Market unproven receipts, proposal-only authority, non-claims, and
issue #49 disposition are accepted as candidate evidence, not as causal or general-benefit proof.

No independent GitHub review submission exists; this comment records the explicit owner decision
rather than fabricating one. The merge authorizes no tag, publication, issue #38 closure, or 0.6
completion claim. Release PR #96 must still be rebased onto the resulting exact main, rebuilt,
re-audited, and pass its final gates.

@eamirian
eamirian marked this pull request as ready for review August 11, 2026 20:26
@eamirian
eamirian merged commit 56db848 into main Aug 11, 2026
6 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

Roadmap: ace-core 0.6.0 — Measured Intelligence

1 participant